over the 2023 SAG-AFTRA strike, output on Dimension 20 originally shut down.[sixteen] In July 2023, Dropout CEO Sam Reich stated that as Dropout is not really a member of your AMPTP, they "might be able to access an interim agreement with SAG" which would let them to resume generation.[17] Reich commented, "but we will only try this, obviously, if